A completes 80% of a work in 20 days. Then B also joins and A and B together finish the remaining work in 3 days. How long does it need for B if he alone completes the work?
There is a tank, and two pipes A and B. A can fill tank in 25 minutes and B can empty the tank in 20 minutes. If both the pipes are opened at same time. How much time required the tank can fill?
A can build a wall in 12 days, B can do the same in 16 days and C can do in 24 days. Totally 6 walls are to be built. 'A' does the work for first 16 days and 'B' continues the work for the next 12 days. How many days should C work?
2 men and 1 woman together can complete a piece of work in 14 days, while 4 women and 2 men together can do it in 8 days. If a man gets Rs. 900 per day, how much should a woman get per day?
Srivari Riveria is a big housing complex in Coimbatore. Giant tanks are placed in every complex building to cater to the needs of the residents. In a block named Annapurna, three taps P, Q and R can fill a tank in 12, 15 and 30 hours respectively. The caretaker of the complex has instructions to keep tap P open all the time and Q and R are to be opened for one hour alternately. In which hour will the tank in Annapurna become full?
A man, a woman, and a child can do a piece of work in 6 days. Man only can do it in 24 days. Woman can do it in 16 days and in how many days child can do the same work?
Pipe A can fill a tank in 30 mins and Pipe B can fill it in 28 mins. If 3/4th of the tank is filled by Pipe B alone and then both are opened, how much time is required by both the pipes to fill the tank completely?
George can do a piece of work in 8 hours. Paul can do the same work in 10 hours, Hari can do the same work in 12 hours. George, Paul and Hari start the same work at 9 am, while George stops at 11 am, the remaining two complete the work. Approximately at what time will the work complete?