Three men can do as much work as 5 boys; and the wages of 3 boys are equal to those of 2 men. A work on which 40 boys and 15 men are employed takes 8 weeks and costs Rs.15750. How long would it take if 20 boys and 20 men were employed, and how much would it cost?