Q 84A can do a piece of work in 15 days and B in 20 days. If they together work it for 4 days, then the fraction of the work that is left is:AOption A: 815{8\over 15}BOption B: 715{7\over 15}COption C: 14{1\over 4}DOption D: 110{1\over 10}