  1. Q 171

    If 18 boys earn Rs. 1200 in 6 days. How much will 25 boys earn in 9 days?

  2. Q 172

    If 25 students can paint a wall in 2 hours. But at the end of every 10 mins, 10 additional students join. In how much time will the whole wall be painted?

  3. Q 173

    A cistern is filled by a tap in 15 hours. Due to a leak in the bottom of the cistern, it takes 5 hours longer to fill the cistern. If the cistern is full how long will it take the leak to empty it?(assume rate of leakage will be constant).

  4. Q 174

    The wages of laborers in a factory increased in the ratio 22:25 and there was a reduction in the labors in the ratio 15:11. Find the original wage bill if the present bill is Rs.5000.

  5. Q 175

    If 3 men with 4 boys can earn Rs. 2100 in 7 days, and 11 men with 13 boys can earn Rs. 8300 in 8 days, in what time will 7 men with 9 boys earn Rs. 11000?

  6. Q 176

    A hemispherical tank full of water is emptied by a pipe at the rate of 416214\frac{{16}}{{21}} litres per sec. Find out the time taken to empty the tank if its diameter is 2m.

  7. Q 177

    Three pipes A, B and C can fill a cistern in 10, 12, and 15 hours respectively, when working alone. If all the three pipes are opened together, then the times taken to fill the cistern will be?

  8. Q 178

    A cistern is provided with two pipes A and B. A can fill it in 20 minutes and B can empty it in 30 minutes. If A and B be kept open alternately for one minute each, how soon will the cistern be filled?

  9. Q 179

    A water tank is (3/5)th full. Pipe A can fill the tank in 10 minutes and pipe B can empty it in 6 minutes. If both the pipes are open, how long will it take to empty or fill the tank completely?

    Show answerHide answer

    Answer: Option C. 9 minutes to empty

    Open question
  10. Q 180

    A contractor undertook a contract for a construction work to be completed in 180 days. He engaged 120 labours. But only 1/6th of the work was done in 1/5th of the scheduled time. The additional number of labours that will be required to complete the work in time, is