# Time and Work questions and answers, page 13

Aptitude. Questions 121 to 130 of 286. Page 13 of 29. HTML page: https://www.megaexam.in/aptitude/time-and-work/page/13

## Q121

A certain number of men can finish a piece of work in 10 days. If however there were 10 men less it will take 10 days more for the work to be finished. How many men were there originally?

A. 10 men
B. 13 men
C. 15 men
D. 20 men
E. none of these

Answer: D. 20 men

Page: https://www.megaexam.in/question/a-certain-number-of-men-can-finish-a-piece-of-work-in-10-days-if-however-there-were-10-men-less-it-will-take-10-days-more-for-the-work-to-be-finished-how-many-men-were-there-originally-688469610272313351

## Q122

It was calculated that 75 men could complete a piece of work in 20 days. When work was scheduled to commence, it was found necessary to send 25 men to another project. How long it will take to complete the work?

A. 35
B. 25
C. 30
D. 45
E. 50

Answer: C. 30

Page: https://www.megaexam.in/question/it-was-calculated-that-75-men-could-complete-a-piece-of-work-in-20-days-when-work-was-scheduled-to-commence-it-was-found-necessary-to-send-25-men-to-another-project-how-long-it-will-take-to-complete-the-work-688469610406531073

## Q123

A software engineer has the capability of thinking 100 lines of code in five minutes and can type 100 lines of code in 10 minutes. He takes a break for five minutes after every ten minutes. How many lines of codes will he complete typing after an hour?

A. 300
B. 250
C. 350
D. 200
E. 400

Answer: B. 250

Page: https://www.megaexam.in/question/a-software-engineer-has-the-capability-of-thinking-100-lines-of-code-in-five-minutes-and-can-type-100-lines-of-code-in-10-minutes-he-takes-a-break-for-five-minutes-after-every-ten-minutes-how-many-lines-of-codes-will-he-complete-typing-after-an-hour-688469610536554497

## Q124

A contractor agreeing to finish a work in 150 days, employed 75 men each working 8 hours daily. After 90 days, only 2/7 of the work was completed. Increasing the number of men by  _____ and each one is  working now for 10 hours daily, the work can be completed in time.

A. 75
B. 225
C. 150
D. 100
E. 175

Answer: C. 150

Page: https://www.megaexam.in/question/a-contractor-agreeing-to-finish-a-work-in-150-days-employed-75-men-each-working-8-hours-daily-after-90-days-only-2-7-of-the-work-was-completed-increasing-the-number-of-men-by-amp-nbsp-and-each-one-is-amp-nbsp-working-now-for-10-hours-daily-the-work-can-be-completed-in-time-688469610637217793

## Q125

It takes Mr. Karthik ‘y’ hours to complete typing a manuscript. After 2 hours, he was called away. What fractional part of the assignment was left incomplete?

A. 1 / y
B. (y-2) / y
C. y / 2
D. y-2
E. (y-3) / 3

Answer: B. (y-2) / y

Page: https://www.megaexam.in/question/it-takes-mr-karthik-amp-lsquo-y-amp-rsquo-hours-to-complete-typing-a-manuscript-after-2-hours-he-was-called-away-what-fractional-part-of-the-assignment-was-left-incomplete-688469610884681731

## Q126

There are two water tanks A and B, A is much smaller than B. While water fills at the rate of one liter every hour in A, it gets filled up like 10, 20, 40, 80, 160... in tank B. ( At the end of first hour, B has 10 liters, second hour it has 20, and so on). If tank B is 1/32 filled after 21 hours, what is the total duration required to fill it completely?

A. 26 hrs
B. 25 hrs
C. 5 hrs
D. 27 hrs
E. None of these

Answer: A. 26 hrs

Page: https://www.megaexam.in/question/there-are-two-water-tanks-a-and-b-a-is-much-smaller-than-b-while-water-fills-at-the-rate-of-one-liter-every-hour-in-a-it-gets-filled-up-like-10-20-40-80-160-in-tank-b-at-the-end-of-first-hour-b-has-10-liters-second-hour-it-has-20-and-so-on-if-tank-b-is-1-32-filled-after-21-hours-what-is-the-total-duration-required-to-fill-it-completely-688469611094396931

## Q127

A can do a piece of work in 12 days while B alone can do it in 15 days. With the help of C they can finish it in 5 days. If they are paid Rs. 960 for the whole work how much money A gets?

A. Rs. 480
B. Rs. 240
C. Rs. 320
D. Rs. 400

Answer: D. Rs. 400

Page: https://www.megaexam.in/question/a-can-do-a-piece-of-work-in-12-days-while-b-alone-can-do-it-in-15-days-with-the-help-of-c-they-can-finish-it-in-5-days-if-they-are-paid-rs-960-for-the-whole-work-how-much-money-a-gets-688469611190865921

## Q128

Sachin does half as much work as Shashi in three fourths of the time. If together they take 18 days to complete the work, how much time will Shashi take to do it?

A. 28 days
B. 30 days
C. 15 days
D. 10 days

Answer: B. 30 days

Page: https://www.megaexam.in/question/-lt-p-gt-sachin-does-half-as-much-work-as-shashi-in-three-fourths-of-the-time-if-together-they-take-18-days-to-complete-the-work-how-much-time-will-shashi-take-to-do-it-lt-p-gt-688469611568353281

## Q129

A is twice efficient than B. A and B can both work together to complete a work in 7 days. Then find in how many days A alone can complete the work?

A. 10.5
B. 11
C. 14
D. 21
E. None of these

Answer: A. 10.5

Page: https://www.megaexam.in/question/a-is-twice-efficient-than-b-a-and-b-can-both-work-together-to-complete-a-work-in-7-days-then-find-in-how-many-days-a-alone-can-complete-the-work-688469611614490627

## Q130

Machine A produces bolts at a uniform rate of 120 every 40 second, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

A. 20 seconds
B. 24 seconds
C. 26 seconds
D. 25 seconds
E. 30 seconds

Answer: D. 25 seconds

Page: https://www.megaexam.in/question/machine-a-produces-bolts-at-a-uniform-rate-of-120-every-40-second-and-machine-b-produces-bolts-at-a-uniform-rate-of-100-every-20-seconds-if-the-two-machines-run-simultaneously-how-many-seconds-will-it-take-for-them-to-produce-a-total-of-200-bolts-688469611971006471

Next page: https://www.megaexam.in/aptitude/time-and-work.md?page=14
