# Time and Work questions and answers, page 11

Aptitude. Questions 101 to 110 of 286. Page 11 of 29. HTML page: https://www.megaexam.in/aptitude/time-and-work/page/11

## Q101

A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is:

A. 8/15
B. 7/15
C. 2/3
D. 31/60
E. None of these

Answer: A. 8/15

Page: https://www.megaexam.in/question/a-can-do-a-work-in-15-days-and-b-in-20-days-if-they-work-on-it-together-for-4-days-then-the-fraction-of-the-work-that-is-left-is-688469606048649221

## Q102

A completes 80% of a work in 20 days. Then B also joins and A and B together finish the remaining work in 3 days. How long does it need for B if he alone completes the work?

A. 36
B. 25
C. 37.5
D. 48
E. None of these

Answer: C. 37.5

Page: https://www.megaexam.in/question/a-completes-80-of-a-work-in-20-days-then-b-also-joins-and-a-and-b-together-finish-the-remaining-amp-nbsp-work-in-3-days-how-long-does-it-need-for-b-if-he-alone-completes-the-work-688469606082203652

## Q103

There is a tank, and two pipes A and B. A can fill tank in 25 minutes and B can empty the tank in 20 minutes. If both the pipes are opened at same time. How much time required the tank can fill?

A. 50 minutes
B. 60 minutes
C. 500 minutes
D. 100 minutes
E. Tank cannot be filled.

Answer: E. Tank cannot be filled.

Page: https://www.megaexam.in/question/there-is-a-tank-and-two-pipes-a-and-b-a-can-fill-tank-in-25-minutes-and-b-can-empty-the-tank-in-20-minutes-if-both-the-pipes-are-opened-at-same-time-how-much-time-required-the-tank-can-fill-688469606514216961

## Q104

A can build a wall in 12 days, B can do the same in 16 days and C can do in 24 days. Totally 6 walls are to be built. 'A' does the work for first 16 days and 'B' continues the work for the next 12 days. How many days should C work?

A. 94.0
B. 47.0
C. 48.0
D. 24.0
E. None of these

Answer: A. 94.0

Page: https://www.megaexam.in/question/a-can-build-a-wall-in-12-days-b-can-do-the-same-in-16-days-and-c-can-do-in-24-days-totally-6-walls-are-to-be-built-amp-39-a-amp-39-does-the-work-for-first-16-days-and-amp-39-b-amp-39-continues-the-work-for-the-next-12-days-how-many-days-should-c-work-688469607202082820

## Q105

2 men and 1 woman together can complete a piece of work in 14 days, while 4 women and 2 men together can do it in 8 days. If a man gets Rs. 900 per day, how much should a woman get per day?

A. Rs. 600
B. Rs. 650
C. Rs. 680
D. Rs. 760

Answer: A. Rs. 600

Page: https://www.megaexam.in/question/2-men-and-1-woman-together-can-complete-a-piece-of-work-in-14-days-while-4-women-and-2-men-together-can-do-it-in-8-days-if-a-man-gets-rs-900-per-day-how-much-should-a-woman-get-per-day-688469607399215105

## Q106

If 20 men take 15 days to complete a job, in how many days can 25 men finish that work?

A. 9
B. 10
C. 16
D. 12
E. 15

Answer: D. 12

Page: https://www.megaexam.in/question/if-20-men-take-15-days-to-complete-a-job-in-how-many-days-can-25-men-finish-that-work-688469607499878403

## Q107

Srivari Riveria is a big housing complex in Coimbatore. Giant tanks are placed in every complex building to cater to the needs of the residents. In a block named Annapurna, three taps P, Q and R can fill a tank in 12, 15 and 30 hours respectively. The caretaker of the complex has instructions to keep tap P open all the time and Q and R are to be opened for one hour alternately. In which hour will the tank in Annapurna become full?

A. 6<sup>th</sup> hour
B. 7<sup>th</sup> hour
C. 5<sup>th</sup> hour
D. 8<sup>th</sup> hour
E. data insufficient

Answer: D. 8<sup>th</sup> hour

Page: https://www.megaexam.in/question/srivari-riveria-is-a-big-housing-complex-in-coimbatore-giant-tanks-are-placed-in-every-complex-building-to-cater-to-the-needs-of-the-residents-in-a-block-named-annapurna-three-taps-p-q-and-r-can-fill-a-tank-in-12-15-and-30-hours-respectively-the-caretaker-of-the-complex-has-instructions-to-keep-tap-p-open-all-the-time-and-q-and-r-are-to-be-opened-for-one-hour-alternately-in-which-hour-will-the-tank-in-annapurna-become-full-688469607499878407

## Q108

A man, a woman, and a child can do a piece of work in 6 days. Man only can do it in 24 days. Woman can do it in 16 days and in how many days child can do the same work?

A. 8
B. 14
C. 16
D. 18
E. None of these

Answer: C. 16

Page: https://www.megaexam.in/question/a-man-a-woman-and-a-child-can-do-a-piece-of-work-in-6-days-man-only-can-do-it-in-24-days-woman-can-do-it-in-16-days-and-in-how-many-days-child-can-do-the-same-work-688469608363905025

## Q109

Pipe A can fill a tank in 30 mins and Pipe B can fill it in 28 mins. If 3/4th of the tank is filled by Pipe B alone and then both are opened, how much time is required by both the pipes to fill the tank completely?

A. 4 Minutes
B. 3 mins 10 seconds
C. 3 mins 62 seconds
D. 4 mins 50 seconds
E. None of These

Answer: E. None of These

Page: https://www.megaexam.in/question/pipe-a-can-fill-a-tank-in-30-mins-and-pipe-b-can-fill-it-in-28-mins-if-3-4th-of-the-tank-is-filled-by-pipe-b-alone-and-then-both-are-opened-how-much-time-is-required-by-both-the-pipes-to-fill-the-tank-completely-688469608384876545

## Q110

George can do a piece of work in 8 hours. Paul can do the same work in 10 hours, Hari can do the same work in 12 hours.  George, Paul and Hari start the same work at 9 am, while George stops at 11 am, the remaining two complete the work. Approximately at what time will the work complete?

A. 11.30 am
B. 12 noon
C. 12.30 pm
D. 1 pm
E. 2 pm

Answer: D. 1 pm

Page: https://www.megaexam.in/question/george-can-do-a-piece-of-work-in-8-hours-paul-can-do-the-same-work-in-10-hours-hari-can-do-the-same-work-in-12-hours-amp-nbsp-george-paul-and-hari-start-the-same-work-at-9-am-while-george-stops-at-11-am-the-remaining-two-complete-the-work-approximately-at-what-time-will-the-work-complete-688469608682672129

Next page: https://www.megaexam.in/aptitude/time-and-work.md?page=12